THE PROCESS
Initial Consultation
We meet with you to listen to your must haves and wishes for your new home. We will determine the aspects as the overall dimensions; features and any upgrades. This is a key point where we will evaluate to determine actual costs to build.
At this point we will know definitively what we must add or take away. At this point you will let us know if you are ready to move forward.
We will then prepare a sales contract and will be ready for the design stage.
Design Your Home
At the initial design meeting, you will decide if you want to work off one of our floor plans. Or we will start assembling a new floor plan. This is a new canvas to layout all your choices and put all the pieces together.
We then forward this layout to our architect for computer generated plans. When the plans are finished, we meet a second time to review them, make any needed changes and resubmit to the architect. This process usually takes three meetings and approximately three weeks before the final plans are exactly as you desire
Let Us Do The Rest
We will build your home from start to finish. After plans are complete, construction usually begins in about 3-4 weeks once we get the appropriate permits.
We have a 43-point building process which begins with planning and ends with the final walk-through. This process includes everything from framing, to plumbing and electric, to cabinets and countertops.
We will update you as the process moves along. You are also welcome to come see our progress along the way.
What is the building process?
After plans are complete, construction usually commences in about 3-4 weeks due to time needed to get appropriate permits. The entire construction process from breaking ground to final walk through usually is completed in 6-8 months.
We start with pre-construction planning which is when we begin to assist you with making selections such as brick, stone, stucco, and roofing. Within 30-60 days, weather permitting, the house foundation, plumbing and framing should be complete. This is a key point in time to make any possible changes without significant expense. Also, at this point in the process, you will be making your remaining selections such as tile, paint colors, and granite.
About two weeks after all plumbing, wiring, and inspections are complete, the drywall is installed. At this stage under normal conditions, we are entering the final month of construction. We will then connect utilities, install cabinets in the kitchen and bath, and install countertops, as well as many other details. Keep in mind at this point as well as any other time, you are welcome to visit the site and contact us with any questions or concerns.
After construction comes to a close, we will conduct a final walk through of the home with you, highlight any cosmetic issues with blue painters tape, and make notes of any significant repairs or corrections. If applicable, the city inspector will make his fourth and final inspection to ensure that the home meets all codes and requirements. You are also welcome to hire a third party inspector to perform a thorough check of your home. When you are completely satisfied with your home, we will then schedule to close escrow.
WE WILL TAKE CARE OF EVERY DETAIL
01
Amazing Agents
We have a high caliber of licensed professionals with very diverse backgrounds such as former military, executives and loan specialists, as well as customer service. All are committed to making this process an effortless and unforgettable experience.
02
Quality Homes
Empyral Group has over 15 years of experience in new construction and remodeling. Our floor plans and features will make you feel right at home. We are proud to offer homes which are personalized to meet the dreams of families across central Texas.